Project: DAI HUNG FIELD DEVELOPMENT – PHASE 03 Client: PVEP-POC Location: Offshore, Vietnam Duration: 2021-2024 Scope of work: FEED and detailed design for WHP, FPU modification, infield pipelines and submarine cable.
Project: KINH NGU TRANG PROJECT – BLOCK 09-2/09 Client: VSP Location: Offshore, Vietnam Duration: 2022 – 2024 Scope of work: FEED and detailed design for CPP, WHP, subsea pipelines, power cable and brownfield modifications.
Project: SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 2 Client: Cuu Long JOC Location: Offshore, Vietnam Duration: 2021-2022 Scope of work: FEED for field development facilities.
Project: NAM CON SON 2 GAS PIPELINE Client: PVGAS Location: Cuu Long and Nam Con Son tank Duration: 2021-2022 Scope of work: Establish FS, FEED and detail design.
Project: LONG SON PETROCHEMICAL COMPLEX PROJECT Client: LSP Location: Vung tau, Vietnam Duration: 2016-2017; 2019-2022 Scope of work: Feasibility Study. Procurement and construction of TCF; construction of PP plant SMP works.
Project: LNG BAC LIEU – ONSHORE GAS PIPELINE PROJECT Client: DOE Location: Bac Lieu, Vietnam Duration: 2021 Scope of work: Topographic survey and FEED.
Project: DAM DOI FIELD DEVELOPMENT. Client: Investor: PVEP Location: Block 46/13 – Block Malay – Block Tho Chu Duration: 2015 Scope of work: Basic design
Project: LOOP PIPELINE – CA MAU GAS PROCESSING PLANT Client: PVGAS. Location: Ca Mau. Duration: 2015. Scope of work: FEED and detail design.
Project: TIEN HAI – THAI BINH LOW PRESSURE GAS DISTRIBU TION PROJECT. Client: PVGAS. Location: Thai Binh Duration: 2014-2015 Scope of work: – Topographic and geotechnical survey; – Detailed Design.
Project: THIEN UNG FIELD DEVELOPMENT Client: VSP Location: Offshore, Vietnam Duration: 2014 Scope of work: FEED and detailed design for field development facilities.