30Project: BKA4 PLATFORM Client: Investor: Vietsopetro Location: Block 9-1 – Cuu Long basin – Vietnam Duration: 2014 Scope of work: FEED and detail design.
Project: THE NORTHERN VIETNAM LNG TERMINAL PROJECT Client: ITECO Location: Hai Phong, Vietnam Duration: 2020-2021 Scope of work: Basic Design, Pre-FEED and update of Basic Design and FS report.
Project: CAI LAN OIL STORAGE PHASE 2 Client: PVOIL. Location: Cai Lan Industrial Park, Quang Ninh province. Duration: 2013-2014 Scope of work: Survey and prepare investment projects.
Project: E5/E100 PROJECTS Client: PVOIL Location: Nha Be. Duration: 2010-2014. Scope of work: Detailed design and EPC construction.
Project: THI VAI REFRIGERATED LPG STORAGE PROJECT Client: PVGAS\ DEAWOO Location: Ba Ria – Vung Tau, Vietnam Duration: 2010-2011 Scope of work: Detailed design, Site Survey.
Project: NHA BE LUBRICANT FACTORY Client: PVOIL, Location: Nha Be. Duration: 2008-2009. Scope of work: EPC procurement and construction.
Project: SU TU NAU FIELD DEVELOPMENT Client: Investor: Cuu Long JOC Location: Block 15.1 – Cuu Long tank – Vietnam Duration: 2013 Scope of work: Detail design.
Project: DUNG QUAT LPG WAREHOUSES Client: PVGAS-SOUTH Location: Dung Quat – Quang Ngai. Duration: 2009 Scope of work: Construction drawing design.
Project: THANG LONG – DONG DO FIELD DEVELOPMENT. Client: Lam Son JOC Location: Offshore, Vietnam Duration: 2011-2012 Scope of work: FEED for infield pipelines and detailed design for WHPs and infield pipelines.
Project: HAI SU DEN FIELD DEVELOPMENT Client: Investor: Thang Long JOC Locacation: Vung Tau Duration: 2011 Scope of work: FEED and Detail design


Tiếng Việt








